This bathroom renovation was completed in 2019. The original bathroom was constructed with builder basic finishes. After demolition of the original, the following task where completed in sequence of construction:

  1. Re-configure rough in new waster water drains for toilet, sinks and shower as layout completely changed from original

  2. Re-configure and rough in new water supply lines

  3. Rough in new electrical wiring for receptacles and switches

  4. Rough in niche and bench seat

  5. Tile shower floor, shower walls and main floor

  6. Grout all tile

  7. Install custom vanity and cabinets

  8. Install natural quartz countertop with undermount sinks

  9. Install natural qartz for shower threshold and glass shower

  10. Install vanity and shower faucet with rain shower head

  11. Install custom shower glass

  12. Install washroom accessories - Towel rack, toilet paper holder, mirrors

  13. Install pot lights and low sones exhaust fan